Showing posts with label mother's day project. Show all posts
Showing posts with label mother's day project. Show all posts

Saturday, May 12, 2007

Fin ( a two for one kind of a day)

Yes, two for one. I finished the butterfly discloth in time for mother's day with time to spare. and i started and finished a crocheted hat yesterday

zee butterfly, shee eez fineeshed!

Butterfly Dish Cloth
Free pattern from the knitlist http://www.knitlist.com
Materials: Lily's Sugar and cream
Modifications: needles (it called for 7's. i preferre 8's)
Inteded recipient: my mom
uh oh, another quick crochet project that snuck up on me...
"boy beanie" from stitch and bitch 'happy hooker'
Materials: All red heart (i'm trying to get rid of all the plastic stuff...)
Modifications: I only loosely followed the pattern.
Start date: May 11 around 3-ish
Finish: May 11 around 6-ish
i'm in love with the flower. I'm also done with all my project spectrum projects for this part of the CAL (craft along!!!)
To go along with the hat i'm thinking of knitting some mittens and then giving this as a christmas present. one can never start too early. I thought i had a jump on it last year. i was wrong. so wrong.
Today was also the Shepherd's Harvest on the fair grounds and i went with my mom. It was pretty cool, i saw parts of a sheep shearing demonstration but left because people kept standing in front of me. The food smelled pretty good but i didn't eat any because it was really expensive.
I did buy yarn. I got one skein of a very soft wool with the color name of 'sour apple' it's a very, very, very bright green, but you've probably noticed already that i like bright colors.
The other yarn i bought was a very pretty pink from a new line called 'shepherd's wool' http://www.stonehedgefibermill.com from those lovely people. It's very soft. Incredibly soft.
I also bought some roving that i intend to make thrummed mittens with. I've been wanting to make them for a long time, but never could find roving.

Tuesday, May 8, 2007

Flutter by, butterfly

The butterfly lace cloth is just flying by (hehe)... right now i'm on the 8 repeat of butterflies of 12, so i should finish either later today or tomorrow and then i'll be able to start on another one. This is a really simple lace pattern. 2 repeats is only 4 rows. wow. well, here she is














want a closer look?


See the butterfly?


the most frustrating thing is that i keep screwing up at the BEGINNING of the rows, and since this is a gift and lace, i have to rip back and fix it!!!! grrr!



but it's a score for me because

1) i'm using up yarn that i have

2) it's another project spectrum color (i still need yellow!!!!)

3) i'm learning more lace!!!!



I should probably check up on when the next phase of project spectrum starts... i think the next set has metallics in there. how is one going to find metallic yarn? (a metallic bead purse project??? i could make a cool bag with black yarn and metallic pony beads (lack of money, woe is me!!!)) i can see it now....

for the other wash cloth i'm thinking a multi colored ball band warsh rag... i don't want to buy more yarn, but it gets harder and harder every day not to...

do needles count?

Sunday, May 6, 2007

Finished (quick, i know!!!)


Finished: Fingerless Gloves

Pattern: Fingerless Gloves by Laurie-Ann Schultz www.soysilk.com

Yarn SWTC Karoke (i used almost the whole skein!!! If you like having things that look similiar, use two balls and start from the same repeat)

Modifications: There were some problems with the pattern, like the hands were reversed and it was written kind of funny... but other than that i did it like i was supposed to.

I don't really like how they're basically two different mittens, but i was just doing them for work (!!!) and just did as i was told. I'll offer to knit another pair so that there will be two matching pairs instead of one mismatched pair. I really like the right hand one, though.

For mother's day, i've decided to knit my mom, grandmas, and aunt wash clothes!!! i know i'm cutting it close seeing that mothers day is in a week and i have about 7 ladies to knit for... but i can do it!! i might have to crochet some... 8 if i knit one for my boyfriend's.... what's a girl to do...

Right now i'm working on the 'Butterfly Lace Dish Cloth' from the knit list. I really hope that i have it finished by this evening....

Saturday, May 5, 2007

Finished!

The cable purse. I finished it this morning. It sat on my floor for quite a bit because i had a bunch of other stuff going on and i just didn't feel like finishing it, but i came home last night from spider man (it was pretty good. the american flag part was unnecessary...) and was still very awake so i just finished it up. lining and all. so here she is.




Cabled Purse



My own Design



Materials: Red Heart super saver and 2 quilter fabric things...



Alterations: none, it was my pattern








It's already gotten some you. Today me and the boyfriend went to Cinco de Mayo in west Saint Paul.



It was very crowded. And rained. So we went to Boca Chica while the rain was at its worst, and of course once we got home the rain stopped. All in all it was a fun day.








In other news, one soysilk fingerless glove is done!!! The pattern is written strangely and the right and left hand directions are reversed. I'm sure that once they're blocked they'll look great, but right now they're kind of gangly. One left!!! i hope i can finish it tonight






Also, mother's day is in a week or so, so i think i'll start a secret project ....shh