Showing posts with label cabled purse. Show all posts
Showing posts with label cabled purse. Show all posts

Saturday, May 5, 2007

Finished!

The cable purse. I finished it this morning. It sat on my floor for quite a bit because i had a bunch of other stuff going on and i just didn't feel like finishing it, but i came home last night from spider man (it was pretty good. the american flag part was unnecessary...) and was still very awake so i just finished it up. lining and all. so here she is.




Cabled Purse



My own Design



Materials: Red Heart super saver and 2 quilter fabric things...



Alterations: none, it was my pattern








It's already gotten some you. Today me and the boyfriend went to Cinco de Mayo in west Saint Paul.



It was very crowded. And rained. So we went to Boca Chica while the rain was at its worst, and of course once we got home the rain stopped. All in all it was a fun day.








In other news, one soysilk fingerless glove is done!!! The pattern is written strangely and the right and left hand directions are reversed. I'm sure that once they're blocked they'll look great, but right now they're kind of gangly. One left!!! i hope i can finish it tonight






Also, mother's day is in a week or so, so i think i'll start a secret project ....shh

Tuesday, May 1, 2007

I got the Job!!!!

So this job i've been going on about this whole time, I got it!!! Barb was almost overwhelmed by all my stuff and i don't know exactly what my job title is, but it's something along the lines of 'teen knitting club consultant' (that probably gives a little hint to my age) So i'm basically going to be a teacher! I'm really glad i got a teaching job because it'll give me a chance to try it out and see if i could really do it. I'm also getting paid to knit samples. My first project (which i'm NOT going to screw up) is a pair of fingerless gloves. amazing. with 50/50 soy silk and wool. wow. (they're paying me, did i say that!)

In other news: the carrot bag is Finished!!! i'll report on that tomorrow, though

Monday, April 30, 2007

New projects!

Because of the job interview, i decided i didn't have enough complicated crochet, thus the hat, and now i've started a little clutch from lion brand that says it's 'intermediate advanced' (i don't think any free sites ever put 'advanced' as a rating, they just want people to buy their yarn, and lots of it...) but so far it's pretty easy, but I am also only on the long rectangle. I should probably mention that contrary to the blogs title, i do crochet! And since i have only done a long pink rectangle, i won't post a picture until i get some lace done (and seeing that crochet goes by quick quick quick, that'll probably be tomorrow, after the interview.)

Because the clutch will be pink, i think i'll join project spectrum and count it for that project. But considering that The others colors are orange and yellow ( i don't really remember to correct me if i'm wrong) i'll still make something for those ('carrot purse' any one? maybe a nice yellow cotton something or other? some one said something to me about cotton the other day... so much yarn, so little time...)
well this is taking away from my valuable crochet time...


in other news, i still need to do another strap for the 'carrot' purse. I did the first one using the cabling with out a cable needle method (it's sweet) and i just need to do a three needle bind off with the other side of the first strap and then i'll start on the other. i think that i'll have just enough yarn to finish the purse.

Saturday, April 28, 2007

The woes of the provisional cast-on

My current project right now is a purse that I really don't want to weave in the ends for. So instead of doing that i've decided to pick up stitches at the bottom and do a three needle bind off where i can. I've decided too late that i should have done a provisional cast-on. I do not know how to do one of those. I think in version 2.0 of the bag, i'll add that. The bag is fairly simple, a different version of my typical bag. I'll get a pattern out once i can figure out how to write it...

In other news, I'm feeling like designing some fair isle. I've dabbled before, but one i finish the bag i think that i'm actually going to try out the pattern. I also think i need to go on a yarn buying hiatus. I know i have some ways to go before i have an actual stash, right now mine could probably be added to some of yours and you wouldn't even know. Also, having only been knitting for about 3 years and being young and not having a lot of money to blow on nice yarns, my stuff is mostly from joann fabric, or left overs from single balls of basic yarn. I did apply for a job at a yarn shop and if (that's a big if, i applied over a week ago and no call yet, I even went in again to see what was up!) i do work there, the yarn diet is possibly off... How can i work there and make money only to be surrounded by stuff that i want, need, have to have! so as of today i won't buy yarn until i have saved up enough money that i deem necessary. I have never, ever saved money in my life. What am i going to do with that money? I'm going to buy something worth while... I think of something expensive that i want.